LEANDER – Freehill Development Co. will build Hero Way West, a 227,200-sf industrial project.
Built on 16.8 acres, the development will have three shallow-bay buildings with 28-ft clear heights.
Construction is slated to begin this summer with a summer 2024 completion.
JLL arranged joint venture equity and floating rate construction financing.