Skip to main content

383K-sf industrial project underway along SH 6

​HOUSTON – Construction is underway on Houston Point 290, a 27.2-acre industrial park that will have three 32-ft clear-height warehouse buildings:

  • Building A at 9320 SH 6 will be 149,918 sf with 210-ft building depth, 31 dock doors, 185-ft truck court, 30 trailer spots, and166 parking spaces;
  • Building B at 9310 SH 6 will be 106,187 sf with 145-ft building depth, 42 dock doors, 185-ft truck court, and 175 parking spaces; and 
  • Building C at 9302 SH 6 will be 126,971 sf with 170-ft depth, 38 dock doors, and 99 parking spaces.

Construction is slated to wrap up in the fourth quarter of this year.​​​​

read more...

Leave a Reply